Oven Clean Out

Remove debris / material from 110’ x 20’ x 16’ oven (note: Oven utilized in the construction & building materials industry). Project begins with Tailgate Safety Meetingthen signoff off meeting attendance by each FEN employee. Perform site walk for lock-out tag-out. Issue permit for Confined Space Entry; prepare / ready the standbyEmergency Rescue Team; Perform [...]

By | 2018-11-02T18:53:13+00:00 December 3rd, 2013|Projects, Uncategorized|Comments Off on Oven Clean Out

Environmental Clean Up Services

Environmental Clean-Up Services Approximately 242 million tires are discarded annually in the United States. First Environmental Nationwide was hired to restore an area used as a tire dumping ground. Cleaning up environmental hazards such as these come as first nature to our experienced team. We have earned an excellent reputation for providing site remediation services. [...]

By | 2018-08-10T04:34:40+00:00 December 3rd, 2013|Projects, Uncategorized|Comments Off on Environmental Clean Up Services

Remember the USS Cole

On December 12, USS Cole (DDG-67), once a powerful symbol of U.S. military might, limped home aboard the Norwegian transport ship M/V Blue Marlin for repairs to a gaping hole left by a bomb attack in Yemen that killed 17 U.S. sailors. The destroyer, unable to sail under its own steam, was carried into a [...]

By | 2018-08-10T04:36:45+00:00 December 3rd, 2013|Projects, Uncategorized|Comments Off on Remember the USS Cole

Tank Cleaning – Removal of Petroleum By-product

Industrial Tank Cleaning Recently, we were called, by a client, to clean a tank that contained a petroleum by-product. Due to an immediate tank inspection, our five man crew worked five, extremely labor intensive, eighteen hour days, using hydro blasters and vacuum trucks to remove the by-product. The by-product was then stored in vacuum boxes [...]

By | 2013-12-03T05:45:53+00:00 December 3rd, 2013|Projects, Uncategorized|Comments Off on Tank Cleaning – Removal of Petroleum By-product

High Pressure Hydroblasting

 Hydroblasting Services FEN was awarded the decontamination work of a large manufacturing plant, which consists of 1.3 million square feet under roof. Completion time of the project is three (3) months, utilizing multiple crews and a fleet of equipment. The building had previously been used in the manufacturing of steel parts and, as a result, [...]